top of page
GIS Solutions

FEATURED PROJECTS

Each project is unique in its essence

At Azimuth 360, we specialize in professional engineering inspection and construction oversight services for roadway and transportation infrastructure projects. Our experienced inspectors provide comprehensive construction inspection, quality assurance and quality control (QA/QC), materials verification, contract compliance monitoring, documentation, reporting, and coordination with project stakeholders to ensure work is performed in accordance with contract documents, applicable standards, and regulatory requirements. With a commitment to technical excellence, accuracy, and integrity, we help public agencies and clients maintain the highest levels of quality, safety, and compliance throughout every phase of construction.

GIS Solutions

GMX Project 87410 | SR-874 Ramp Connector to SW 128th Street:

Design-Build Services delivered a new ramp connection from the southern terminus of SR-874/Don Shula Expressway to SW 128th Street, including widening of SW 128th Street from two to four lanes between SW 122nd Avenue and SW 137th Avenue, to improve mobility and reduce congestion in West Kendall/Southwest Miami-Dade County. Total project cost was approximately $108.7 million.

CEI Services
CEI Services

CEI FDOT 439999-2-62-01 - CEI Services for Savannas Preserve State Park.

. This CEI phase paired with construction FIN 439999-2-52-01 (Contract E4U88), covering the "Savannas Preserve State Park Gap" segment of the SUN Trail from Walton Road to Lennard Road, roughly 6.6 miles, in St. Lucie County work included a shared-use path with structure monitoring/inspection, concrete removal and sidewalk work, signing, pavement markings, and sod. CEI oversight involved contract administration, field inspection, and quality assurance to ensure the contractor's work met FDOT standards, coordinated with the Department of Environmental Protection given the project's location within the state park. The construction proposal budget estimate for this segment was approximately $8.64 million.

4.png

FDOT FIN# 448241-1-72-10 GEC Transp Operations D4. District Maintenance Office I595.

This is a task assignment under FDOT District 4's Traffic Operations Continuing for a 5-year term beginning August 2022, with a $5 million funding limit, providing in house engineering staffing embedded at the District Maintenance Office supporting I-595 operations. Services include data collection, GIS support, plan reviews, and various traffic operations studies and assessments to augment FDOT District 4 staff on an as needed basis.

Azimuth 360 Consulting Group

LOCATIONS

Miami -Dade : Doral and Kendall
Broward & Palm Beach: Fort Lauderdale and Delray Beach

PHONE

Miami Office: +1 786 554-3050

Broward Office: +1 786 306-9269

EMAIL

© 2026 Azimuth 360 Consulting Group. All rights reserved.

Follow us

  • Instagram
bottom of page